{"591596":{"#nid":"591596","#data":{"type":"news","title":"Historic Savant Building Under Renovation ","body":[{"value":"\u003Cp\u003EThe project includes removing all non-historic structural elements on the first floor and creating a new suite for the office of the Dean of the Ivan Allen College. In addition to the office suites, all of the windows and entry doors will be replaced in order restore the building\u0026rsquo;s historical appearance. Second and third floors will remain occupied during construction. \u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EHistoric Building: 1901\u003C\/li\u003E\r\n\t\u003Cli\u003EAdaptive Reuse: The building was originally designed to support electrical engineering\u003C\/li\u003E\r\n\t\u003Cli\u003ENew lighting\u003C\/li\u003E\r\n\t\u003Cli\u003ENew mechanical systems\u003C\/li\u003E\r\n\t\u003Cli\u003EAutomatic fire suppression system\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ECONSTRUCTION DETAILS:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EStart Date: May 22, 2017\u003C\/li\u003E\r\n\t\u003Cli\u003EAnticipated End Date: August 30, 2017\u003C\/li\u003E\r\n\t\u003Cli\u003ENormal working hours: 7am-5pm\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E\u003Cem\u003ECampus Detours or Interruptions:\u003C\/em\u003E\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThere will be no office relocations during this project. Building visitors heading to the second and third floors will need to utilize a connecting bridge at Swann building to gain access.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe construction\u0026nbsp;staging area on Cherry Street will be cordoned off.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe Ivan Allen College, Office of Graduate Studies\u0026nbsp;and Office of International Education WILL\u0026nbsp;NOT be relocated.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe renovation will create a new suite for the office of the Dean of the Ivan Allen College and restore historic character to the building.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Renovation will create a new suite for the office of the Dean of the Ivan Allen College."}],"uid":"27705","created_gmt":"2017-05-09 20:03:09","changed_gmt":"2017-05-15 12:15:02","author":"Jessica Rose","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2017-05-09T00:00:00-04:00","iso_date":"2017-05-09T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"591731":{"id":"591731","type":"image","title":"Savant Building Construction Map 2017","body":null,"created":"1494850450","gmt_created":"2017-05-15 12:14:10","changed":"1494850450","gmt_changed":"2017-05-15 12:14:10","alt":"Construction map ","file":{"fid":"225530","name":"Savant_May2017_MapOnly3.png","image_path":"\/sites\/default\/files\/images\/Savant_May2017_MapOnly3.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Savant_May2017_MapOnly3.png","mime":"image\/png","size":5277336,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Savant_May2017_MapOnly3.png?itok=6TlXokaq"}}},"media_ids":["591731"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"955","name":"ivan allen college"},{"id":"172157","name":"fm-detours"},{"id":"174200","name":"fm-notices"},{"id":"61411","name":"Campus Construction"},{"id":"3348","name":"historic architecture"},{"id":"143251","name":"detour"},{"id":"143241","name":"Facilities-detour"},{"id":"143221","name":"Facilities-Notices"},{"id":"142501","name":"FMDetour"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJessica Rose\u003C\/p\u003E\r\n\r\n\u003Cp\u003EFacilities Communications Officer\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003ENicolas Palfrey\u003C\/p\u003E\r\n\r\n\u003Cp\u003EProject Manager\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jrose@gatech.edu "],"slides":[],"orientation":[],"userdata":""}}}