{"604059":{"#nid":"604059","#data":{"type":"news","title":"Dalney Building Parking","body":[{"value":"\u003Cp\u003EThe garage will provide nearly 800 parking spots. The office building on the south face of the garage will be approximately 55,000-sf and will house the Georgia Tech Research Corporation administrative offices. The lower level of the office building will include space for a future blackwater reclamation system. As part of our mission for future sustainability, a photovoltaic array will be planned for future implementation on the top level of the parking deck.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EConstruction Details:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EStart Date:\u003C\/strong\u003E 05\/07\/2018\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EEnd Date:\u003C\/strong\u003E 08\/31\/2018\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ECampus Detours or Interruptions:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe W26 parking lot will be permanently removed from service. A temporary path to access the parking area between Center St. Apartments and 430 10th St. (south) will be provided from the W25 parking lot.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThis project entails the permanent removal of the W26 parking lot\u0026nbsp;to be replaced with a new 800 parking space parking garage.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"This project entails the permanent removal of the W26 parking lot and replacing it with a new 800 parking space parking garage."}],"uid":"34634","created_gmt":"2018-03-20 18:13:19","changed_gmt":"2018-04-09 11:43:57","author":"svalkenburgh3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2018-03-20T00:00:00-04:00","iso_date":"2018-03-20T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"604120":{"id":"604120","type":"image","title":"Dalney Parking Deck","body":null,"created":"1521721468","gmt_created":"2018-03-22 12:24:28","changed":"1521721468","gmt_changed":"2018-03-22 12:24:28","alt":"","file":{"fid":"230283","name":"pages_from_2018-03-14_-_pdc_presentation.png","image_path":"\/sites\/default\/files\/images\/pages_from_2018-03-14_-_pdc_presentation.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/pages_from_2018-03-14_-_pdc_presentation.png","mime":"image\/png","size":2710867,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/pages_from_2018-03-14_-_pdc_presentation.png?itok=uEL4nMcf"}}},"media_ids":["604120"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143241","name":"Facilities-detour"},{"id":"143221","name":"Facilities-Notices"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EProject Manager (Design): Brad Morris\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECommunications Officer: Jessica Rose\u003C\/p\u003E\r\n","format":"limited_html"}],"email":[],"slides":[],"orientation":[],"userdata":""}}}