{"623412":{"#nid":"623412","#data":{"type":"news","title":"GTRI Entrance Improvements begin final stage July 29","body":[{"value":"\u003Cp\u003E\u003Ca name=\u0022_MailEndCompose\u0022\u003EThe State Street entrance into the gravel lot North of Baker Building will be closed starting Monday, July 29th\u0026nbsp;.\u0026nbsp; The plan is to complete pavers and the new concrete apron off State Street into the gravel lot \u0026nbsp; During this time access to the gravel lot will be provided through the paved lot off of Dalney Street \u0026ndash; watch for signage and cones designating the connecting drive from the paved area to the gravel area.\u0026nbsp; Please caution your patrons that this connecting drive must be left open in order for everyone to access the gravel lot area.\u0026nbsp;\u003C\/a\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ETentative Construction Completion Date:\u0026nbsp;\u0026nbsp;\u003C\/strong\u003EWednesday, August 7th, 2019\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003Cstrong\u003EImpact (see attached map):\u0026nbsp;\u003C\/strong\u003E\u0026nbsp; \u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026middot;Traffic control devices will be placed to maintain continuous in-bound and out-bound traffic on State Street throughout project duration. (May 28\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;to August 7th)\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026middot;\u0026nbsp;Select parking spaces in paved lot North of Baker will be required to be blocked during stair demolition. (Timeframe \u0026ndash; TBA)\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E\u003Cem\u003ESee attached traffic control plan for further clarification.\u0026nbsp; These dates are subject to change depending on weather. \u0026nbsp;\u003C\/em\u003E\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":[{"value":"GTRI entrance improvements slate for week of July 29"}],"field_summary":[{"value":"\u003Cp\u003EFinal improvements begin July 29\u0026nbsp;on the new concrete apron off State Street into the gravel lot.\u0026nbsp; Please be aware of new traffic cones and signage.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Traffic Control Plan for State St. Entrance Closure begins July 29"}],"uid":"35028","created_gmt":"2019-07-15 20:12:56","changed_gmt":"2019-07-23 15:03:09","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-07-15T00:00:00-04:00","iso_date":"2019-07-15T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"623413":{"id":"623413","type":"image","title":"GTRI Entrance Improvements traffic plan July 22","body":null,"created":"1563221943","gmt_created":"2019-07-15 20:19:03","changed":"1563221943","gmt_changed":"2019-07-15 20:19:03","alt":"map of State Street Final traffic control plan for GTRI","file":{"fid":"237420","name":"State Street Final Traffic Control Plan Entrance Closure (2).jpg","image_path":"\/sites\/default\/files\/images\/State%20Street%20Final%20Traffic%20Control%20Plan%20Entrance%20Closure%20%282%29_0.jpg","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/State%20Street%20Final%20Traffic%20Control%20Plan%20Entrance%20Closure%20%282%29_0.jpg","mime":"image\/jpeg","size":2337271,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/State%20Street%20Final%20Traffic%20Control%20Plan%20Entrance%20Closure%20%282%29_0.jpg?itok=LrTOKn2h"}}},"media_ids":["623413"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"178532","name":"construction-updates"},{"id":"171998","name":"construction notices"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJennifer Disotell\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;Special Projects Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["Jennifer.Disotell@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}