{"628315":{"#nid":"628315","#data":{"type":"news","title":"Campus Center Construction Updates - November - December 2019","body":[{"value":"\u003Cp\u003E\u003Cstrong\u003EGeneral:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Construction traffic in this sector of campus.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Normal working hours 6:00 AM \u0026ndash; 5:30 PM.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPhase I Building Construction (within project fence line):\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Pre- Engineered Metal Buildings and roofing for the Caf\u0026eacute; and Pavilion buildings will be erected.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Exterior metal framing, sheathing, and waterproofing at the Exhibition Hall will continue.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Roofing at Exhibition Hall will be substantially complete.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Exhibition Hall masonry and window systems installation will begin.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall will be installed.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Interior metal framing walls and door frames will be installed at Exhibition Hall.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPhase I Utilities:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Storm, sanitary sewer, and power ductbank will be installed north of the Student Center Parking Garage 9\/6\/2019 \u0026ndash; 12\/20\/2019.\u0026nbsp; Work should pass Smithgall 11\/15\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Fencing will remain in place to provide barriers between construction activities and the campus.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Way finding signage has been placed around this part of campus to provide alternate routes.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EIn the month of November 2019, Phase I work including construction of the Exhibition Hall, Pavilion and Caf\u0026eacute; buildings will continue for the Campus Center project.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Construction Impacts for Campus Center during the months of November and December 2019"}],"uid":"35028","created_gmt":"2019-10-29 18:33:30","changed_gmt":"2019-10-31 18:01:38","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-10-29T00:00:00-04:00","iso_date":"2019-10-29T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"628311":{"id":"628311","type":"image","title":"Campus Center Construction Updates - November 2019","body":null,"created":"1572373119","gmt_created":"2019-10-29 18:18:39","changed":"1572373151","gmt_changed":"2019-10-29 18:19:11","alt":"map of Campus Center Logistics November 2019 - page 1","file":{"fid":"239282","name":"GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-1.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png","mime":"image\/png","size":1013511,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png?itok=rlQs8ZEL"}},"628312":{"id":"628312","type":"image","title":"Campus Center Construction Updates - November 2019","body":null,"created":"1572373263","gmt_created":"2019-10-29 18:21:03","changed":"1572373263","gmt_changed":"2019-10-29 18:21:03","alt":"map of Campus Center Logistics November 2019 - page 2","file":{"fid":"239283","name":"GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page2.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png","mime":"image\/png","size":827380,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png?itok=a2Q3PUuR"}},"628313":{"id":"628313","type":"image","title":"Campus Center Construction Updates - November 2019 ","body":null,"created":"1572373350","gmt_created":"2019-10-29 18:22:30","changed":"1572373350","gmt_changed":"2019-10-29 18:22:30","alt":"map of Campus Center Logistics November 2019 - page 3","file":{"fid":"239284","name":"GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page3.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png","mime":"image\/png","size":841399,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png?itok=TYfLygNr"}},"628314":{"id":"628314","type":"image","title":"Campus Center Construction Updates -  November  2019","body":null,"created":"1572373418","gmt_created":"2019-10-29 18:23:38","changed":"1572373418","gmt_changed":"2019-10-29 18:23:38","alt":"map of Campus Center Logistics November 2019 - page 4","file":{"fid":"239285","name":"GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page4.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png","mime":"image\/png","size":699133,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png?itok=NMEl0M6e"}}},"media_ids":["628311","628312","628313","628314"],"related_links":[{"url":"http:\/\/www.studentcenter.gatech.edu\/campus-center","title":"Student Center"}],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"176331","name":"Campus Center"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EFor further information regarding this project, contact\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003ENicolas Palfrey\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECapital Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-363-7520\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["nicolas.palfrey@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}