<node id="628315">
  <nid>628315</nid>
  <type>news</type>
  <uid>
    <user id="35028"><![CDATA[35028]]></user>
  </uid>
  <created>1572374010</created>
  <changed>1572544898</changed>
  <title><![CDATA[Campus Center Construction Updates - November - December 2019]]></title>
  <body><![CDATA[<p><strong>General:</strong></p>

<p>*Construction traffic in this sector of campus.</p>

<p>*Normal working hours 6:00 AM &ndash; 5:30 PM.</p>

<p><strong>Phase I Building Construction (within project fence line):</strong></p>

<p>*Pre- Engineered Metal Buildings and roofing for the Caf&eacute; and Pavilion buildings will be erected.</p>

<p>*Exterior metal framing, sheathing, and waterproofing at the Exhibition Hall will continue.</p>

<p>*Roofing at Exhibition Hall will be substantially complete.</p>

<p>*Exhibition Hall masonry and window systems installation will begin.</p>

<p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall will be installed.</p>

<p>*Interior metal framing walls and door frames will be installed at Exhibition Hall.</p>

<p><strong>Phase I Utilities:</strong></p>

<p>*Storm, sanitary sewer, and power ductbank will be installed north of the Student Center Parking Garage 9/6/2019 &ndash; 12/20/2019.&nbsp; Work should pass Smithgall 11/15</p>

<p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p>

<p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p>

<p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p>

<p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p>

<p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p>&nbsp;</p>
]]></body>
  <field_subtitle>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_subtitle>
  <field_dateline>
    <item>
      <value>2019-10-29T00:00:00-04:00</value>
      <timezone><![CDATA[America/New_York]]></timezone>
    </item>
  </field_dateline>
  <field_summary_sentence>
    <item>
      <value><![CDATA[Construction Impacts for Campus Center during the months of November and December 2019]]></value>
    </item>
  </field_summary_sentence>
  <field_summary>
    <item>
      <value><![CDATA[<p>In the month of November 2019, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p>

<p>&nbsp;</p>
]]></value>
    </item>
  </field_summary>
  <field_media>
          <item>
        <nid>
          <node id="628311">
            <nid>628311</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239282</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-1.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 1]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628312">
            <nid>628312</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239283</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page2.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 2]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628313">
            <nid>628313</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates - November 2019 ]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239284</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page3.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 3]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628314">
            <nid>628314</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates -  November  2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239285</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page4.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 4]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
      </field_media>
  <field_contact_email>
    <item>
      <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>
    </item>
  </field_contact_email>
  <field_location>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_location>
  <field_contact>
    <item>
      <value><![CDATA[<p>For further information regarding this project, contact&nbsp;</p>

<p>Nicolas Palfrey</p>

<p>Capital Project Manager</p>

<p>470-363-7520</p>
]]></value>
    </item>
  </field_contact>
  <field_sidebar>
    <item>
      <value><![CDATA[<p>The&nbsp;<strong>Campus Center Project</strong>&nbsp;will renovate portions of the existing Student Center and expand services into four new buildings across a 15-acre site to create program spaces necessary for the&nbsp;growing campus.</p>
]]></value>
    </item>
  </field_sidebar>
  <field_boilerplate>
    <item>
      <nid><![CDATA[]]></nid>
    </item>
  </field_boilerplate>
  <!--  TO DO: correct to not conflate categories and news room topics  -->
  <!--  Disquisition: it's funny how I write these TODOs and then never
         revisit them. It's as though the act of writing the thing down frees me
         from the responsibility to actually solve the problem. But what can I
         say? There are more problems than there's time to solve.  -->
  <links_related> </links_related>
  <files> </files>
  <og_groups>
          <item>383831</item>
      </og_groups>
  <og_groups_both>
          <item>
        <![CDATA[Institute and Campus]]>
      </item>
      </og_groups_both>
  <field_categories>
          <item>
        <tid>129</tid>
        <value><![CDATA[Institute and Campus]]></value>
      </item>
      </field_categories>
  <core_research_areas>
      </core_research_areas>
  <field_news_room_topics>
      </field_news_room_topics>
  <links_related>
          <link>
      <url>http://www.studentcenter.gatech.edu/campus-center</url>
      <title></title>
      </link>
      </links_related>
  <files>
      </files>
  <og_groups>
          <item>383831</item>
      </og_groups>
  <og_groups_both>
          <item><![CDATA[Facilities Management]]></item>
      </og_groups_both>
  <field_keywords>
          <item>
        <tid>143221</tid>
        <value><![CDATA[Facilities-Notices]]></value>
      </item>
          <item>
        <tid>176331</tid>
        <value><![CDATA[Campus Center]]></value>
      </item>
          <item>
        <tid>61411</tid>
        <value><![CDATA[Campus Construction]]></value>
      </item>
      </field_keywords>
  <field_userdata>
      <![CDATA[]]>
  </field_userdata>
</node>
