  <title><![CDATA[Campus Center Construction Update - December 2019]]></title>
  <body><![CDATA[<p>In the month of December 2019, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p>

<p><strong>General:</strong></p>

<p>*Construction truck traffic in this sector of campus.</p>

<p>*Normal working hours 6:30 AM &ndash; 5:30 PM.</p>

<p><strong>Phase I Building Construction (within project fence line):</strong></p>

<p>*Pre- Engineered Metal Buildings and roofing for Pavilion buildings will be erected.</p>

<p>*Exterior metal framing, sheathing, and waterproofing at Caf&eacute; building will be installed.</p>

<p>*Waterproofing, flashing, masonry and windows will be installed at Exhibition Hall.</p>

<p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall installation will continue.</p>

<p>*In- wall electrical and plumbing systems at the Exhibition Hall installation will continue.</p>

<p>*Underground domestic water and fire line service will be installed.</p>

<p><strong>Phase I Utilities:</strong></p>

<p>*Storm, sanitary sewer, and power ductbank will be installed north of the Student Center Parking Garage 9/6/2019 &ndash; 12/20/2019.</p>

<p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p>

<p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p>

<p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p>

<p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p>

<p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p>

<p><strong>Phase II Existing Utilities Site Investigation:</strong></p>

<p><strong>&nbsp;</strong>*At the Campanile Plaza area, site investigations to verify and confirm locations of existing underground utilities will be performed.</p>

<p>*Temp barricades and signage will be placed around work perimeter to direct pedestrian traffic.</p>

<p>*Small localized excavations using a hydrovac truck will be mobilized.</p>

<p>*The hydrovac truck will access the work area from the W21 parking lot.&nbsp; Subsequently, 3 parking spaces in the extreme south end will be closed for staging.</p>

<p>*Small areas will be cut into the turf and landscape areas.&nbsp; These areas will be backfilled and patched once investigations are complete.</p>

<p>*Site logistics plan is attached.</p>

<p><strong>Old OIT Engineering Building &ndash; Temp WREK Radio:</strong></p>

<p>*Miscellaneous interior renovations including new walls, electrical, and HVAC work will occur during the months of December and January.</p>

<p>*Areas of the building&rsquo;s adjacent parking lot will be dedicated to Contractors and logistics.</p>

<p>&nbsp;</p>
]]></body>
  <field_subtitle>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_subtitle>
  <field_dateline>
    <item>
      <value>2019-11-26T00:00:00-05:00</value>
      <timezone><![CDATA[America/New_York]]></timezone>
    </item>
  </field_dateline>
  <field_summary_sentence>
    <item>
      <value><![CDATA[Construction Impacts for Campus Center during the month December 2019]]></value>
    </item>
  </field_summary_sentence>
  <field_summary>
    <item>
      <value><![CDATA[<p>Campus Center construction continues through the month of December.</p>
]]></value>
    </item>
  </field_summary>
  <field_media>
          <item>
        <nid>
          <node id="629431">
            <nid>629431</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Impacts - December 2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239700</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Campanile Plaza Hydrovac - 20191125v2.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020191125v2.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020191125v2.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[aerial view of campus center construction campinile hydrovac]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="629430">
            <nid>629430</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Impacts - December 2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239699</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan WREK Radio Swing Space - 20191122 (1).png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20WREK%20Radio%20Swing%20Space%20-%2020191122%20%281%29.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20WREK%20Radio%20Swing%20Space%20-%2020191122%20%281%29.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[aerial map of construction logistics plan WREK Radio Swing Space]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628314">
            <nid>628314</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates -  November  2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239285</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page4.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 4]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628313">
            <nid>628313</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates - November 2019 ]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239284</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page3.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 3]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="628311">
            <nid>628311</nid>
            <type>image</type>
            <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>
            <body><![CDATA[]]></body>
                          <field_image>
                <item>
                  <fid>239282</fid>
                  <filename><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-1.png]]></filename>
                  <filepath><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></filepath>
                  <file_full_path><![CDATA[http://www.tlwarc.hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></file_full_path>
                  <filemime>image/png</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 1]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
      </field_media>
  <field_contact_email>
    <item>
      <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>
    </item>
  </field_contact_email>
  <field_location>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_location>
  <field_contact>
    <item>
      <value><![CDATA[<p>For further information regarding this project contact:</p>

<p><strong>Nicolas Palfrey</strong></p>

<p>Capital Project Manager</p>

<p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>

<p>470-363-7520</p>
]]></value>
    </item>
  </field_contact>
  <field_sidebar>
    <item>
      <value><![CDATA[<p>The&nbsp;<strong>Campus Center Project</strong>&nbsp;will renovate portions of the existing Student Center and expand services into four new buildings across a 15-acre site to create program spaces necessary for the&nbsp;growing campus.</p>
]]></value>
    </item>
  </field_sidebar>
  <field_boilerplate>
    <item>
      <nid><![CDATA[]]></nid>
    </item>
  </field_boilerplate>
  <!--  TO DO: correct to not conflate categories and news room topics  -->
  <!--  Disquisition: it's funny how I write these TODOs and then never
         revisit them. It's as though the act of writing the thing down frees me
         from the responsibility to actually solve the problem. But what can I
         say? There are more problems than there's time to solve.  -->
  <links_related> </links_related>
  <files> </files>
  <og_groups>
          <item>383831</item>
      </og_groups>
  <og_groups_both>
          <item>
        <![CDATA[Institute and Campus]]>
      </item>
      </og_groups_both>
  <field_categories>
          <item>
        <tid>129</tid>
        <value><![CDATA[Institute and Campus]]></value>
      </item>
      </field_categories>
  <core_research_areas>
      </core_research_areas>
  <field_news_room_topics>
      </field_news_room_topics>
  <links_related>
      </links_related>
  <files>
      </files>
  <og_groups>
          <item>383831</item>
      </og_groups>
  <og_groups_both>
          <item><![CDATA[Facilities Management]]></item>
      </og_groups_both>
  <field_keywords>
          <item>
        <tid>143221</tid>
        <value><![CDATA[Facilities-Notices]]></value>
      </item>
          <item>
        <tid>176331</tid>
        <value><![CDATA[Campus Center]]></value>
      </item>
          <item>
        <tid>180766</tid>
        <value><![CDATA[campus center construction]]></value>
      </item>
      </field_keywords>
  <field_userdata>
      <![CDATA[]]>
  </field_userdata>
</node>