{"668707":{"#nid":"668707","#data":{"type":"news","title":"Campus Improvements to Impact Pedestrian Paths Between MARC and MRDC July - November 2023","body":[{"value":"\u003Cp\u003EThe replacement of steam and condensate lines for the Manufacturing Research Center (MARC) and the Manufacturing Related Disciplines Complex (MRDC) will impact pedestrian pathways between the two buildings from August through mid-November 2023. The egress from the ground level of MRDC will have a fence in place allowing for safe entry to and exit from the building. The main pedestrian path south of MARC will be the path to and from the construction site. Please use caution when traveling this path. The attached aerial maps outline the impacted areas.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe replacement of the steam and condensate lines for the MARC and the MRDC buildings will affect pedestrian pathways.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"To replace steam and condensate lines for the MARC and MRDC buildings, construction will affect pedestrian pathways."}],"uid":"35028","created_gmt":"2023-08-02 21:12:55","changed_gmt":"2023-08-02 21:29:47","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2023-08-02T00:00:00-04:00","iso_date":"2023-08-02T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"671306":{"id":"671306","type":"image","title":"Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 1png_Page_1.png","body":null,"created":"1691010858","gmt_created":"2023-08-02 21:14:18","changed":"1691010858","gmt_changed":"2023-08-02 21:14:18","alt":"Pedestrian pathways affected by construction near MARC and MRDC Georgia Tech campus","file":{"fid":"254337","name":"Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 1png_Page_1.png","image_path":"\/sites\/default\/files\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%201png_Page_1.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%201png_Page_1.png","mime":"image\/png","size":4732084,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%201png_Page_1.png?itok=g1zO7-9N"}},"671307":{"id":"671307","type":"image","title":"Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 2png_Page_2.png","body":null,"created":"1691011027","gmt_created":"2023-08-02 21:17:07","changed":"1691011027","gmt_changed":"2023-08-02 21:17:07","alt":"Layout of impacted pedestrian pathways around MARC and MRDC on Georgia Tech campus","file":{"fid":"254338","name":"Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 2png_Page_2.png","image_path":"\/sites\/default\/files\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%202png_Page_2.png","image_full_path":"http:\/\/www.tlwarc.hg.gatech.edu\/\/sites\/default\/files\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%202png_Page_2.png","mime":"image\/png","size":7008107,"path_740":"http:\/\/www.tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2023\/08\/02\/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%202png_Page_2.png?itok=Vt54GXC4"}}},"media_ids":["671306","671307"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"66601","name":"Manufacturing Research Center (MARC)"},{"id":"13944","name":"manufacturing related disciplines complex"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EBrian Doles\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-854-8262\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["brian.doles@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}